PTT評價

Re: [新聞] 美迫我一次編齊預算買百套魚叉 現卻告知

看板Military標題Re: [新聞] 美迫我一次編齊預算買百套魚叉 現卻告知作者
zaku7777
()
時間推噓78 推:81 噓:3 →:72

2020 年 5 月 13 日
The Boeing Co., St. Louis, Missouri, is awarded a $656,981,421 modification
(P00014) to a previously awarded firm-fixed-price contract
(N00019-19-C-0016). This modification procures and delivers 467 Harpoon fullrate production Lot 91 Block II missiles and support equipment for various
Foreign Military Sales customers.

This modification procures four Block II missiles and support equipment for
the government of Brazil, eight Block II missiles and support equipment for
the government of Thailand, 53 Block II missiles and support equipment for
the government of Qatar, 402 Block II missiles and support equipment for the
government of Saudi Arabia, and support equipment for the governments of
Japan, the Netherlands, India and Korea. Work is expected to be complete by
December 2026.

2020年5月13日,美軍與波音簽約,以6.56億美元,為外國客戶採購467枚魚叉飛彈,
版本是Lot 91 Block II ,這包括了巴西,泰國,卡達,沙烏地阿拉伯,
以及為日本,荷蘭,印度,南韓的魚叉飛彈提供維保設備,預定在2026年12月以前完成.

WASHINGTON, October 26, 2020 - The State Department has made a determination
approving a possible Foreign Military Sale to the Taipei Economic and
Cultural Representative Office in the United States (TECRO) of up to one
hundred (100) Harpoon Coastal Defense Systems (HCDS) and related equipment
for an estimated cost of $2.37 billion. The Defense Security Cooperation
Agency delivered the required certification notifying Congress of this
possible sale today.

TECRO has requested to buy up to one hundred (100) Harpoon Coastal Defense
Systems (HCDS) consisting of up to four hundred (400) RGM-84L-4 Harpoon BlockII Surface Launched Missiles; and four (4) RTM-84L-4 Harpoon Block II
Exercise Missiles. Also included are four hundred and eleven (411)
containers, one hundred (100) Harpoon Coastal Defense System Launcher
Transporter Units, twenty-five (25) radar trucks, spare and repair parts,
support and test equipment, publications and technical documentation,
personnel training and training equipment, U.S. Government and contractor
representatives’ technical assistance, engineering and logistics support
services, and other related elements of logistics support. The total
estimated program cost is $2.37 billion.

這是2020年10月26日,美國DSCA通知國會,將出售100套魚叉系統給台灣,預計是
23.7億美元,包括了400枚 RGM-84L-4 Harpoon Block II 飛彈 與25輛雷達車
以及相關備件,維保,人員訓練等等.

2021年9月28日
The Boeing Co., St. Louis, Missouri, is awarded a $220,000,000
cost-plus-incentive-fee order (N0001921F0886) against a previously issued
basic ordering agreement N0001921G0006.

This order provides non-recurring engineering in support of configuration
efforts for the Harpoon Coastal Defense System (HCDS), to include the HarpoonBlock II Update Grade B Canister Launch All Up Round Missiles, the HCDS
launch system, and Harpoon weapon station test and production equipment for
the government of Taiwan.

and various locations outside the continental US (0.07%), and is expected to
be completed in July 2023. Foreign Military Sales customer funds in the
amount of $107,800,000 will be obligated at time of award, none of which willexpire at the end of the fiscal year.

在2021年9月28日,美軍與波音簽約,為出售台灣的陸基魚叉系統提供啟動量產的
生產線訂單,飛彈型號是 Harpoon Block II Update Grade B ,
預定結束時間是2023年7月,總金額是2.2億美元.

這訂單指明了"非經常性工程" ,在2021年9月,陸基魚叉只有台灣要買,
並且包括了整套系統,也就是說,美方必須為台灣另外安排組裝線,
以及進行必要的開發,整合與測試的規劃.

而2021年民110年海軍的公開預算根本沒列入魚叉系統.
是2022年民111年才列入,

17.魚叉飛彈海岸防衛系統:
(1)計畫必要性:為提升本軍打擊武力及攻擊範圍,有效增加制海作戰能力,規劃籌建機動飛彈車中隊,並配置魚叉飛彈海岸防衛系統,以具備機動性執行多波次飛彈攻擊,
並協同水面作戰艦艇遂行灘岸殲敵任務,以嚇阻敵軍事冒進。
(2)依據:全案整體獲得規劃書奉國防部109年8月20日國略建軍字第1090176159號令
核定;另奉國防部110年9月29日國略建軍字第1100218783號令修訂,計畫籌獲魚叉飛彈
海岸防衛系統100套,計需86,601,349千元,納入110-119年度編列,分年預算編列如下:

<1>110年度:計畫執行魚叉飛彈海岸防衛系統陣地工程整建,預算62,596千元;
其中「450111武器裝備整備購製」編列59,803千元,「150110採購及外購軍品作業費」
編列2,793千元。
<2>111年度:計畫執行魚叉飛彈防衛系統及支援測試裝備解繳、能量技術轉移、
備份料件及陣地工程整建,預算1,432,498千元;
其中「150104一般武器及戰備支援裝備購製」編列1,428,481千元,
「900201一般設施整建工程」編列1,080千元,
「150110採購及外購軍品作業費」編列2,937千元。
<3>112年度:計畫執行魚叉飛彈防衛系統及支援測試裝備解繳、能量技術轉移、
備份料件、人員維修訓練、裝備驗測及陣地工程整建,預算6,551,813千元;
其中「150104一般武器及戰備支援裝備購製」編列5,956,100千元,
「900201一般設施整建工程」編列592,746千元,
「150110採購及外購軍品作業費」編列2,967千元。


從以上可知,美方發標的時間,比台方修訂的時間還早一天,
而2021(110年)與2022(111年),台方只投入約15億台幣,
但美方2021年發標的金額是2.2億美元.


2022年3月2日
The Boeing Co., St. Louis, Missouri, is awarded a not-to-exceed $498,310,000
firm-fixed-price undefinitized order (N0001922F0030) against a previously
issued basic ordering agreement (N0001921G0006).
This order provides for the production and delivery of the Harpoon Coastal
Defense System Launch System (HCDS) in support of the government of Taiwan,
specifically 100 Launcher Transporter Units, 25 Radar Units, and HCDS
training equipment.
and various locations within the continental US (5.53%), and is expected to
be completed in December 2028.

2022年3月2日,美軍正式對波音發包陸基魚叉系統,第一次訂單金額是4.98億美元,
應執行的總設備數是100個發射運輸裝置,25個雷達等等
預定要執行的2028年12月完成.


而我們也知道,要到2023(民112年)台灣才會編到65億台幣左右的預算.

因此,整個陸基魚叉案,其實一直是美方先行,拖著台灣走,

並允許先上車後補票.

魚叉飛彈的產能本來就有限,波音生產解繳467枚,需要6年半的時間,

但為台灣生產100輛發射車,25輛雷達車,也差不多是6年多,整體速度算起來還快一些,

前者可是純飛彈,並不需要另外處理車輛與雷達等等.



--

※ PTT 留言評論
※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 218.173.102.196 (臺灣)
PTT 網址

en4002 10/23 19:38

rex01 10/23 19:41

viewer1946 10/23 19:42推解釋

meowgy 10/23 19:42

semicoma 10/23 19:45所以是立法院的問題嗎?

rtwodtwo 10/23 19:46特定立委+特定媒體

bunjie 10/23 19:46

CoachKuester10/23 19:48馬大立委+中時聯合=請自己推敲

zmax 10/23 19:50

super131556610/23 19:51推推

BenjaminLin710/23 19:51推 揭博士之前也有說國軍軍購預算本來就是分多年去

BenjaminLin710/23 19:51付款給美方了

lyu000 10/23 19:52

TRESS 10/23 19:53

skyhawkptt 10/23 19:55推!

PTTHappy 10/23 19:56所以 重點是 跟我方幾年付清無關 美方產速本來就需

PTTHappy 10/23 19:566年才能完成訂單上全部數目囉?

JCrawford 10/23 19:58看來我大台灣才是老鼠屎 XD

privatecho 10/23 19:58

Dannyx 10/23 19:59

longdeck 10/23 19:59謝謝米國爸爸不離不棄

crow0801 10/23 20:01推 整理

pcchuckwu 10/23 20:02感謝說明!

marco4014 10/23 20:02推整理

tonyatta 10/23 20:04++

chyx741021 10/23 20:06其實進度還是落後了,2023年的預算從65億砍到15億

sangupafiber10/23 20:10整個踢爆了?

jess730612 10/23 20:12聯合報整串造謠懶得一一點名 洪姓記者難道不知道?

jess730612 10/23 20:12美國對台軍售從來就沒有一次付清過這種事

massrelay 10/23 20:13

jess730612 10/23 20:13台灣立法院編列預算也從來就沒有一次就整付清過

chyx741021 10/23 20:15「魚叉海岸防衛系統」預算是從110年編到119年,除

chyx741021 10/23 20:15非真的可以在預算編列期程提前交付完畢,不然說是

chyx741021 10/23 20:15花十年也沒什麼不對

sangupafiber10/23 20:15為什麼聯合報總是派某記者幹這種事?是不是他很黑

sangupafiber10/23 20:15啊XD?

cloudfour 10/23 20:16外交國防委員會,聽到馬姓立委出來基本上都是鬧劇

cloudfour 10/23 20:16比較多,不過嚴格來說委員會裡還真的沒幾個懂國防

cloudfour 10/23 20:16的...只是這位又是裡面特別誇張的

chyx741021 10/23 20:16因為聯合報就只有洪姓記者專跑軍事新聞

weimr 10/23 20:17

ny40yankees 10/23 20:18推解釋@@原來是美國硬拖著用啊

Yanrei 10/23 20:20聯合如果看他FB的文字更恐怖,每一篇都在引戰...

jess730612 10/23 20:22Reewalker貼的那篇內容謬誤 整串有多少人在造謠鬼扯

jess730612 10/23 20:25美國聯邦政府軍售 FMS DCS 流程軍事記者會不知道嗎?

rex01 10/23 20:26因為可以騙騙不會去深入瞭解的一般人

cannedtuna 10/23 20:27

Stunts 10/23 20:32好可憐,2027就要統獨大戰了,貨還沒交完,拿掃把

Stunts 10/23 20:32上嗎?

allan0926 10/23 20:34推~也讓人知道誰沒穿褲子

Bf109G6 10/23 20:35

allan0926 10/23 20:35這段時間可以看看台灣的內奸有什麼樣的表演

jyekid 10/23 20:40貨永遠不嫌夠 越多越好 屆時有什麼就打什麼

letterE 10/23 20:44non-recurring engineering 是術語,也就是一次性

letterE 10/23 20:44研發的投入。一般業界再加上Expense簡稱為NRE,就

letterE 10/23 20:44是專案前期研發的時候需要投入的費用,而這個費用

letterE 10/23 20:44項目在之後的量產不會再發生的意思。所以這個地方

letterE 10/23 20:44是美國政府發包給波音整合魚叉岸防系統的箱射飛彈

letterE 10/23 20:44,發射系統,還有測試以及生產設備。採購生產設備

letterE 10/23 20:44不一定是另外開產線,也可以是要改造或者升級產線

letterE 10/23 20:44

losel 10/23 20:44整理推

peterlee97 10/23 20:45這篇推文是怎樣 扣帽是嗎? 這裡明明寫6年才能完成

peterlee97 10/23 20:45 然後前一篇新聞內是寫:

peterlee97 10/23 20:45“美方卻告知我方因產能不足,全案要分10年解繳”

peterlee97 10/23 20:45 “114年(2035)才能完成” 國防部也沒有對此質詢

peterlee97 10/23 20:45否認 現在推文在護航什麼東西? 2027說匪共要來了

peterlee97 10/23 20:45結果2035才會完全到貨 然後現在開始反獵巫開始扣帽

peterlee97 10/23 20:45人家是內奸 什麼鬼??

ipojay 10/23 20:46有發射車 所以這次買的是可機動的魚叉 那就有價值了

saygogo 10/23 20:49內奸之多

tatt 10/23 20:51釣出一堆帳號

Zuiho 10/23 20:51內奸哦?peterlee97你看看題目那個要求編齊預算 再

Zuiho 10/23 20:51看看事情 然後你自己思考一下什麼是內奸

Zuiho 10/23 20:52只能說啦 有些媒體當年去聽汪洋訓話之後真的很 嗯

kis28519 10/23 20:52

chyx741021 10/23 20:54預算書是執行到119年,也就是最晚就是2030年,2035

chyx741021 10/23 20:54年是哪冒出來的時間?

dos01 10/23 20:55蛙靠 2022了 還有人相信媒體製造業欸!!!!

dos01 10/23 20:55唔喔唔喔! 竟然還有這種人!!!!! 哈哈哈哈

henrytsai 10/23 20:58就分10年編列的案子 「一次編齊」在哪裡?

Aksky 10/23 20:58peterlee97你是把陸基魚叉跟刺針飛彈兩案搞混了吧

henrytsai 10/23 20:58扣帽?馬姓立委還需要人家扣他帽子嗎

kuma660224 10/23 21:00欸 不管分幾年 軍購都是依期程付款的

kuma660224 10/23 21:01絕不是一次性付款 沒人這樣玩

kuma660224 10/23 21:01頂多是開案時一次用一個案子核定完

kuma660224 10/23 21:02但後續還是依交貨期程 晚交貨就晚付款

kuma660224 10/23 21:02交貨高峰期才是付款高峰期

kuma660224 10/23 21:02這是軍購常識

yor 10/23 21:03推解釋

kuma660224 10/23 21:03就算特別預算 也是依執行程序分年看進度撥款

spirit119 10/23 21:04

kuma660224 10/23 21:04特別預算審查也只是一次決定總額 不是撥款

idunhav1 10/23 21:14其實沙國買更多的是SLAM-ER 也是差不多在5月的時候

idunhav1 10/23 21:15搭美海軍便車 然後台灣也是同年

PTTHappy 10/23 21:15美方說6年可全造完 但國防部分10年付清-國防部在拖?

chyx741021 10/23 21:18因為從核准到簽發價書就要一兩年的時間,2020年底

chyx741021 10/23 21:18核准,到簽約已經是2022年了,美國軍售行政流程冗

chyx741021 10/23 21:18長的長期問題

kuma660224 10/23 21:19軍購的完成通常含交貨後培訓到FOC成軍

kuma660224 10/23 21:20新載台IOC/FOC通常也是用年在算

chyx741021 10/23 21:23一個軍購案從雙方政府討論、我方建案到美方核准,

chyx741021 10/23 21:23大概就要2年時間,美方核准公佈後一直到簽完發價書

chyx741021 10/23 21:23,可能又是一兩年過去

brabra 10/23 21:24要麻就是馬文君睜眼說瞎話,不然就是不用功做功課

b1izzard200010/23 21:25大推

bbeck 10/23 21:27紅明顯 中國想侵略台灣 就別想用統獨之戰掩飾

aegis43210 10/23 21:29所以真的是臺灣被迫買那麼多,多到需要十年來交貨

aegis43210 10/23 21:30那麼可能隨著情勢變化,美方也可能再縮短期程

bbeck 10/23 21:30補推 普丁說特別軍事行動 全世界都認為那就是侵略

mark0204 10/23 21:33Reewalker 會不會來這篇發表意見呢?哈~~~

mark0204 10/23 21:381995開始恐嚇了27年,還要再恐嚇5年喔,好~可~怕~~~

kwht 10/23 21:56謝謝查證整理, 儘管自己沒時間查, 看到中時就知道

kwht 10/23 21:56有敵國在利用民主流程來搞鬼

allan0926 10/23 21:57偷換概念顛倒時序是強項

xc091832 10/23 22:09看起來魚叉發射車跟雷達會先交完,但飛彈產能有限還

xc091832 10/23 22:09要先給沙烏地貨,爭取交車時同步移轉美軍庫存魚叉軍

xc091832 10/23 22:09援,應該會是比較合適的做法

user048288ef10/23 22:09

glad850 10/23 22:13推,真的是要靠美方幫忙推屁股才肯動兩下

xc091832 10/23 22:15PTTHappy 文要看清楚,發射車跟雷達預定2028年底可

xc091832 10/23 22:15以生產完畢,但飛彈要先出貨給前面先下單的467枚,

xc091832 10/23 22:15生產線要在2026年底後才能全速應付臺灣訂單

xc091832 10/23 22:17這樣就很尷尬,前幾年到貨的發射車可能沒彈或者沒辦

xc091832 10/23 22:17法滿架,今年空軍還多下60枚訂單,真不知道2030能不

xc091832 10/23 22:17能拿到貨

aegis43210 10/23 22:23臺灣雄二和雄三已經夠多了,魚叉也只是美方要求買個

aegis43210 10/23 22:23保險

xc091832 10/23 22:23其實去年年底有說會加速期程,希望三年內(2024年底

xc091832 10/23 22:23?)能交至少半數系統,2029前全部交完,不過看現在

xc091832 10/23 22:23這進度大概要跳票,元老院會不爽也是理所當然

rex01 10/23 22:25魚叉可以作飽和攻擊,只要載具跟人員夠,多多益善

xc091832 10/23 22:27台海環境反艦飛彈永遠不嫌多,假設中華神盾水準等同

xc091832 10/23 22:2790年代神盾,那也要十多枚飛彈圍攻才能飽和,所以現

xc091832 10/23 22:27在國軍還是拼命買反艦飛彈,今年一批空射魚叉,LRAS

xc091832 10/23 22:27M還在爭取中,同時海軍造二級艦又要載增程雄三

bakedgrass 10/23 22:51

StanGly 10/23 23:23紅明顯 看到peterlee急了就知道這篇對了

Linlauvu 10/23 23:26上一篇是記者+立委的夢幻組合耶,要小心看啊各位

Pegasus170 10/23 23:37推細節解釋

BW556 10/24 00:02有憑有據 非常讚!

king9122 10/24 00:03推解釋

stoneofsea 10/24 00:32

kkttaipeityy10/24 00:40感謝Zaku大闢謠

shawncarter 10/24 00:53

newest 10/24 00:54

nn1975 10/24 01:26ㄧ堆內應 看了真的很煩

ctes940008 10/24 03:01

Smoltzy 10/24 03:10

Atvancia 10/24 03:18

st89702 10/24 08:23台灣提升防衛能力內部一直有人在扯後腿 其心可議價

peterlee97 10/24 08:45StanGly 怎樣 又一個沒看過的帳號跑來扣帽了是吧?

hsiliang 10/24 11:13有考據,推

bbeck 10/24 12:13推 感謝zaku7777查證 軍武板鄉民專業度>>>軍事記者

balius 10/24 20:54推zaku大

tuna0214 10/25 12:21